Marine Guidance Note
MGN 657 Amendment 2
requirements for fixed aerosol fire extinguishing systems for use in small vessel machin…
- Version
- Amendment 2
- Published
- 2 April 2026
- Applies to
- Merchant ships · Fishing vessels · Small commercial vessels
- Topics
- Safety equipment · Survey and certification
xplor’s summary, not the official text
This Marine Guidance Note sets out Maritime and Coastguard Agency requirements for fixed aerosol fire extinguishing systems for use in normally unoccupied machinery spaces of small vessels, and for UK Approved Bodies to approve such systems. Amendment 1 clarifies design density calculation on net protected-space volume and the test criteria. Amendment 2 amends paragraph 4.16 so that, in a single fault scenario, at least the test density can still be discharged, in line with MSC.1/Circ.1270. The guidance applies to small vessels under 24 metres load line length, including small commercial codes vessels, and to surveyors and system providers.
Written by xplor from the notice's text on 17 November 2026. It is a summary, not the notice: rely on the official text.
For yacht crew
Crew on commercial yachts under 24 metres fitted with aerosol fire systems in machinery spaces should follow the installation, isolation switch, monthly inspection and annual servicing requirements in this note.
What changed in Amendment 2
Amendment 2 amends section 4.16 of the Appendix so that, in a single fault scenario, at least the test density will be discharged, aligning with MSC.1/Circ.1270.
xplor's summary of the change, not the MCA's.
Sections of the notice
- Summary
- 1. Introduction/background
- 2. General
- 3. UK Approved Bodies and Certifying Authorities
- 4. Fixed Aerosol Fire Extinguishing Systems Approval
- 5. Vessel Installation Requirements
- 6. Installation, Commissioning and Maintenance Requirements
- More information
- APPENDIX MCA Fire Test Approval Procedures - Fixed Aerosol Fire Extinguishing Systems for Small Vessel Machinery Spaces
- 1. Definitions
- 2. Test Enclosures
- 3. Required Fire Tests
- Figure 1: Test enclosure (Plan View all Dimensions in millimetres)
- Table 1: Fire scenarios
- Figure 2: Engine mock-up (all Dimensions in millimetres)
- 4. Principal Requirements
- 5. Success Criteria:
- 6. Test Report:
- 7. Certificate:
- 8. References:
The notice's own headings. The text of each is in the official notice on GOV.UK.