HELM-M-L2.2

Planning, workload and procedures

HELM-M-M2 · Managing people and work · HELM-M-M2-A Performance and people management, and planning, resources and standard operating procedures.

At management level you plan the **season, the refit and the department**, not just the watch. A-II/2 adds the duty to **develop, implement and oversee SOPs**.

Planning and procedures

Governing: STCW Table A-II/2 'task and workload management', 'effective resource management' and 'development, implementation, and oversight of standard operating procedures'; REG Yacht Code Part A Chapters 23A and 23B.

Planning at management level

Horizon Chief officer / chief engineer Captain
Day Work lists, rotas, guest programme Itinerary, weather, owner liaison
Voyage Passage and port plans, stores, crew rest Approval, risk, contingency
Season Maintenance plan, training, drills, leave Budget, crewing, charter calendar
Refit Work scope, yard liaison, crew tasks Contract, cost, quality

A-II/2 lists the same four elements as the operational level (planning and co-ordination, personnel assignment, time and resource constraints, prioritisation), but now applied to a department over weeks and months.

Resource management

Resources are people, equipment, time and money. Management-level resource management means:

  • people: crewing levels that meet safe manning and allow rest; skills mix; cover for leave and sickness;
  • equipment: maintenance timed around operations, spares, redundancy for critical systems;
  • time: realistic programmes with contingency;
  • money: making the case to the captain and management company for what safety requires.

The criterion is that operations are planned and resources allocated in correct priority.

Rotas and rest

Rotas must deliver the minimum rest in MSN 1877 (10 hours in any 24, 77 in any 7) through charter, yard and delivery periods. If they cannot, the plan is wrong. Records must be accurate.

SOPs

A-II/2 adds development, implementation and oversight of standard operating procedures. On commercial yachts they sit inside the safety management system:

Yacht REG Yacht Code Part A
Under 500 GT Chapter 23A: a safety management system as described in the chapter
500 GT and over Chapter 23B: comply with SOLAS IX (the ISM Code)

Good SOPs:

  • are written with the people who do the task;
  • are short, specific to the yacht and usable on deck;
  • state the hazards, the controls, roles and abort criteria;
  • are reviewed after incidents, near misses, equipment changes and at set intervals;
  • are trained, drilled and checked, not just filed.

The MCA guide notes that violations usually happen in the name of efficiency. If crew routinely work round a procedure, the procedure may be wrong. Find out before enforcing it.

Oversight

Implementing a procedure is not the end. Oversight means walking the deck, watching the task done, asking crew how it works in practice, and reviewing records. The A-II/2 criterion is that operations are demonstrated to be effective and in accordance with applicable rules.

CAUTION — Paper compliance An SMS that looks complete on the shelf but does not match what happens on deck is a liability, not a defence.

TIP — Change management Before changing a procedure, a rota or a piece of equipment, ask what else it affects. New toys, new tenders and new crew all change risk.

Practice questions

5 questions

recall · core

Which new knowledge item appears in A-II/2 compared to the operational level? (a) Situational awareness (b) Workload management (c) Development, implementation and oversight of standard operating procedures (d) Assertiveness

recall · core

Under the REG Yacht Code, what applies to commercial yachts of 500 GT and over? (a) Compliance with SOLAS IX (the ISM Code) (b) Only a crew list (c) No safety management requirement (d) The Small Commercial Vessel Code

recall · core

What does REG Yacht Code 23A.1 require of vessels under 500 GT? (a) Full ISM certification (b) Nothing (c) An ISPS plan (d) A safety management system as described in Chapter 23A

recall · core

Who is best placed to draft a practical SOP for tender launching? (a) The people who do the job, reviewed by the HoD and captain (b) The owner (c) An external consultant who has never seen the yacht (d) The management company alone

scenario · core

You are chief officer planning a six-week shipyard period followed immediately by a Caribbean charter season. Half the deck crew are new. What is the best planning approach? (a) Build an integrated plan: yard tasks, training and familiarisation for new crew, drills, rest and leave, and SOP reviews, with milestones and contingency (b) Plan day by day (c) Leave planning to the bosun (d) Plan the yard work only and deal with charter later

Independent study. xplor is not an accredited training provider and awards no certificate or Certificate of Competency. The HELM(M) certificate required for UK management-level CoCs is issued only by an MCA-approved training provider after its own continuous observed and written assessment. AI-drafted content pending subject-matter-expert review.